SpaceRef Asia · About Us · Advertising · Contact Us · Comments Saturday, November 21, 2009    
 

Advertisement
SpaceRef Asia
Home | Calendar - News - Photo Gallery - Space Station Guide - Space Weather - Mars Today

(New) Collaborate on Space Projects at OnOrbit ColabSpace - Astrobiology Web - Space Elevator - Space Wire
STATUS REPORT
Date Released: Wednesday, December 27, 2006
Source: Japan Aerospace Exploration Agency (JAXA)

Completion of the Critical Phase of the Engineering Test Satellite VIII KIKU No. 8

image

The Japan Aerospace Exploration Agency (JAXA) shifted the attitude control mode of the Engineering Test Satellite VIII "KIKU No. 8" to the regular control mode at 4:14 a.m. on December 27, 2006 (Japan Standard Time, JST). All functions of the satellite have been verified to be normal after the control mode shift.

This marks the end of the critical phase, and we are moving to the initial functional verification phase.

In the initial functional verification phase, it will take about two weeks for the orbit to be gradually coordinated to the target Geostationary orbit at an east longitude of 146 degrees from the current drift orbit. Also, we will check the onboard equipment for about three and half months in cooperation with the National Institute of Information and Communications Technology (NICT) and Nippon Telegraph and Telephone Corporation (NTT,) who are the collaborative development organizations of the "KIKU No. 8."

We would like to extend our profound appreciation to all related parties who have supported the launch and tracking and control operations of the "KIKU No. 8."


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

advertisment


Home | Calendar - Gallery - Space Station
SpaceRef Canada - SpaceRef Europe - SpaceRef USA - Astrobiology Web - Mars Today - Space Elevator - Nano2Sol

Copyright © 1999-2009 SpaceRef Interactive Inc. All rights reserved. Privacy Policy