SpaceRef Asia · About Us · Advertising · Contact Us · Comments Saturday, November 21, 2009    
 

Advertisement
SpaceRef Asia
Home | Calendar - News - Photo Gallery - Space Station Guide - Space Weather - Mars Today

(New) Collaborate on Space Projects at OnOrbit ColabSpace - Astrobiology Web - Space Elevator - Space Wire
STATUS REPORT
Date Released: Wednesday, December 27, 2006
Source: Japan Aerospace Exploration Agency (JAXA)

Deployment Result of the Large Deployable Antenna Reflectors of the Engineering Test Satellite VIII KIKU No. 8

image

The Japan Aerospace Exploration Agency (JAXA) performed the remaining deployment operations for the large deployable antenna reflectors (LDR) onboard the Engineering Test Satellite VIII "KIKU No. 8" between 6:56 p.m. and 8:10 p.m. on December 26, 2006 (Japan Standard Time, JST) by sending commands from the Okinawa station. These included the release of the lower holding mechanism and the deployment of the reflectors for the sending antenna that were suspended.

As a result, JAXA confirmed through telemetry data and images from onboard cameras sent from the satellite that the deployment of the sending antenna was successful. Images of the LDR acquired from the "KIKU No. 8" are attached below. This marks the completion of the LDR deployment.

The satellite is in a stable condition.

The satellite will shift to the regular attitude control mode and will progress from the critical phase to the initial functional verification phase. We expect to be able to announce the completion of the critical phase around 10:00 a.m. on Dec. 27.

(Note)

Critical phase: the period starting from the launch until the readiness to move to the initial functional verification phase, including solar array paddle deployment after separation from the launch vehicle, LDR deployment, then shifting to the regular mode attitude control.

Attachment: Deployment Images of Large Deployable Antennas http://www.jaxa.jp/press/2006/12/20061226_kiku8-2_e.html#at01


 


News from Commercial Space Watch

- Recovery Act: Water Management in California: Cyber Infrastructure for Irrigation Optimization

- Former Shuttle Astronaut-Astronomer, Sam Durrance, Joins the CSF Suborbital Researchers Group

- Satellite-Based Earth Observation Market Entering Phase of Impressive Growth

- NASA and Lighting Science Sign Agreement to Develop Lighting for Space Exploration

- Sky No Longer the Limit for Digital Magazines

- NASA Develops Algae Bioreactor as a Sustainable Energy Source

- Aerojet Engines Support Space Shuttle Atlantis' Re-stocking Mission to International Space Station

- Suborbital Applications Researchers Group Meets in Washington

- NewSpace Is Under Attack

- Pratt & Whitney Rocketdyne Successfully Tests Thruster for Unmanned Lunar Lander

- bacus Technology Corporation Awarded NASA Kennedy Space Center Small Business Prime Contractor of the Year - 2009

- NASA ARC Memo; Procurement Sensitivity of the Competition of Aeronautics and Exploration Mission Modeling and Simulation Request for Proposal NNA09274979R

- Lockheed Martin Tests Carbon Nanotube-Based Memory Devices on NASA Shuttle Mission

- Leonid Meteor Shower to Perform Late Tonight

- Sri Lanka signs agreement with SSTL for space capability

advertisment


Home | Calendar - Gallery - Space Station
SpaceRef Canada - SpaceRef Europe - SpaceRef USA - Astrobiology Web - Mars Today - Space Elevator - Nano2Sol

Copyright © 1999-2009 SpaceRef Interactive Inc. All rights reserved. Privacy Policy